|
|

Final Wet Sanding Of The Body 1/13/07 - Completed the final wet sanding with 600 grit paper. It...
|

Wet Sanding Here's a view of the rolled dash edge and the front end.
|

Wet Sanding The Front DS Fender Here's a shot down the side of the car. To check the straightness,...
|

Wet Sanding The Rear A shot of the rear end. You can't tell it but I moved the license...
|

Wet Sanding The Rear Rolled Edge This shot shows the rear rolled edge.
|

Modifying The MSD Box Mounting Scheme 1/21/07 - To facilitate removal, I removed the MSD6AL module from the rubber...
|

Leather Covered Hinges And Support Wire 1/22/07 - I covered the otherwise plane steel hinges with leather, added...
|

Final Assembly Of The Trunk Aluminum 1/25/07 - Installed all the trunk alumuninum panels that I polished...
|

Chassis And Body Ready For Installation 1/27/07 - Prepared the chassis to accept the body by removing the side pipes,...
|

Moving The Body I enlisted the help of some neighbors and fellow FFR builder FORDCSX, working...
|

Slowly Lowering It Into Position The nose was massaged into place and then the back was dropped down.
|

Double Checking The Oil Cooler Fit This was the first time the oil cooler and the front radiator aluminum...
|

Massaging The Back Over The Bulb Seal This was the most difficult part of fitting the body. The next and...
|

Drip Tube Interference I installed some small brass drip tubes in the front corner of the...
|

Seating The Windshield Wipers As the body was lowered, the wiper wheel boxes were positioned and pulled...
|

The Body Is On Removing the body support brace after the body was seated.
|

Going Back Into The Shop The car went back in. Over the next few days I installed all the...
|

My Blue Choice - Lexus Indigo Ink Pearl Here's my color choice. It's a dark blue pearl-metallic that...
|

Taking The Car To The Painter 2/23/07 - The body work is completed to the point where it can be...
|

Body Wiped Down And Ready For Sealer The car as delivered. It's wiped down and tack'ed off and...
|

Applying The Sealer The painter shooting the 2K sealer. Note the hood is setting on the...
|

A Shot Of The Car In Sealer In The Booth First we applied a 2-part urethane sealer to keep the body work and...
|

Indigo Base Coat Application In this shot, the silver is already sprayed on the center of the car and the...
|

Transformation Completed A shot after the last clear coat was completed.
|

12 Hours Later At 2:30 AM After 12 hours of continuous work and taping, the blue and silver...
|
|
|
Comments
Add a comment